Motorists are advised of changed traffic conditions from tomorrow for essential maintenance to continue on Paytens Bridge on Paytens Bridge Road, 10 km south west of Eugowra.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Work will be carried out from Friday 11 October between 7am and 6pm on weekdays and between 8am and 1pm on Saturdays.
Maintenance work is expected to be completed by Friday 25 October 2019, weather permitting.
During this time there will be a speed limit reduction to 20 km/h and a width reduction on the single lane bridge.
Motorists are advised to drive to the conditions, allow extra travel time and follow the direction of signs and traffic control.
Transport for NSW thanks motorists for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.