Flood-prepped pool closed this week

Updated November 22 2021 - 5:13pm, first published 3:24pm
PREPARED: Equipment was removed and pumps switched off at Forbes Olympic Pool in preparation for major flooding; Council says it will take a little time to get it open again. Picture: Brendan McCool
PREPARED: Equipment was removed and pumps switched off at Forbes Olympic Pool in preparation for major flooding; Council says it will take a little time to get it open again. Picture: Brendan McCool

Forbes Olympic Pool is currently closed to the public and all user groups, but Forbes Shire Council says it is working to reopen the facility as soon as possible.

Subscribe now for unlimited access.

$0/

(min cost $0)

or signup to continue reading

See subscription options